The whole group trips the RCD when switched on together, but not one at a time. Each driver contributes earth leakage current, and a simultaneous close adds a transient on top. Sizing formula for a 30 mA RCD, three ways to split the circuit, a six-step location procedure and four factors that make it worse.
A whole group of luminaires trips the residual current device when switched on together but not one at a time. In most cases nothing is wrong with the drivers: every switched-mode supply contributes a small earth leakage current, and with enough units the sum matters - plus a transient on top when they all close at once. This article gives a size limit you can compute, three ways to fix it, and a six-step procedure to locate the cause.
The one-sentence rule: design to one third of the rated residual current, not to the rating
On a 30 mA RCD, design to 10 mA, about one third of I delta n
The remaining two thirds absorb transients, ageing and damp-season insulation drop
At a typical 0.5 mA per unit: about 20 units per circuit. At 0.75 mA: about 13
An RCD does not trip at one hard value. On a 30 mA type, it should not trip below about 15 mA (0.5 x I delta n) and should trip above 30 mA, with an uncertain band between. Design has to keep out of that band instead of sitting against 30 mA. Exact classes and types follow the device datasheet and local rules.
Where the leakage comes from: every unit contributes
A switched-mode supply has EMI suppression capacitors (X and Y) across its input and parasitic capacitance in the transformer primary, and together they form a small path to earth during normal operation. That current:
is normal operating current, not failed insulation
grows with power rating, larger units leak more
exists on constant-voltage units H01, K01 and S01 and on constant-current unit H19 alike - take the figure from the leakage current line of the datasheet, never from a rule of thumb
Computing how many units fit
n_max = (I_delta_n x 0.33) / I_leak_per
I_delta_n rated residual operating current of the RCD (commonly 30 mA)
0.33 design factor, leaving room for transients and ageing
I_leak_per leakage current of one driver (from the datasheet, typically 0.25 to 0.75 mA)
For a 30 mA RCD on a 230 V 50 Hz system:
Leakage per unit
Design limit
Reaching the 15 mA band
What it means on site
0.25 mA
about 40 units
60 units
Small units, rarely a problem
0.50 mA
about 20 units
30 units
Typical band for mid-power constant-voltage units
0.75 mA
about 13 units
20 units
Large units; whole-floor facades hit this first
1.00 mA
about 10 units
15 units
The circuit must be split
The second column is the design figure; the third is only where it starts to get risky. Damp seasons and capacitor ageing eat the gap between them.
One parameter separates the two curves: 0.5 mA to 0.75 mA per unit drops the same circuit from 20 units to 13
Why one at a time is fine but all at once trips: the transient layer
Closing units one by one spreads the inrush over time. Closing them together means:
every input EMI capacitor and bus capacitor charges at the same instant, so inrush and earth-capacitor charging current add up
the peak lasts a very short time, milliseconds, but its amplitude is commonly several times the steady-state sum (a field observation, not a standard value)
a circuit that sits at only 8 mA steady state can therefore cross 30 mA during closing
That is why the leakage meter reads low and the breaker still trips. The test is simple: if closing one at a time holds but closing the main trips, it is transient summation, not an insulation fault.
Three ways to fix it, in order
Split the circuit (first choice): divide one RCD way into two or three, each inside the design limit. It costs a few modules in the board and it shrinks the failure zone - one way trips, the rest stay lit
Get the real per-unit leakage and recount: ask the supplier for the measured leakage current in the datasheet and recompute with the 0.33 factor. Sometimes a lower-leakage model holds the existing circuit, which is cheaper than reworking the board
Change the protection scheme: a time-delayed (selective) RCD upstream with ordinary RCDs or MCBs downstream, so only the layer nearest the fault trips. This is distribution design: it must be done by a licensed electrician to local rules, and it has to be confirmed that the higher rated residual current is permitted at that location
Swapping a 30 mA device for a 100 mA one is the easiest option and the last one you should take: it lowers personal protection and most local rules do not allow it. Try the first two first.
Four things that make it worse (check these before touching the board)
Neutral and earth crossed or earthed twice: part of the working current returns through earth and the residual current is artificially raised
Driver cases bonded to large metalwork: luminaires or trunking increase parasitic capacitance to earth; an insulating shim helps
Long output cable run against earth or metal: same effect, very visible on outdoor facades
Insulation drop in the damp season: rainy seasons and condensing basements are the peak season for nuisance tripping; readings fall again once dry - design for the worst season, do not accept on a dry day
Six steps to locate it
Tell leakage from overcurrent: RCD only, MCB holding means leakage; both tripping or the MCB alone is an inrush current and breaker sizing problem
Close one way at a time: find which way, shrinking the search from a whole floor to one circuit
Clamp the residual current: clamp line and neutral together on a single-phase circuit; the reading is the residual current. Compare against the 10 mA design value
Halve the load: disconnect half, close again, and narrow down each round
Inspect wiring and mounting: neutral and earth crossed, case bonded to metalwork, output cable routing
Get the datasheet figure and recount: with the real leakage current, decide between splitting the circuit and changing the model
Acceptance checklist
Per-unit leakage taken from the datasheet, not estimated
Units per RCD way at or below (I delta n x 0.33) divided by per-unit leakage
Main switch closed three times, no trip
Residual current re-measured in the damp season, or after a water test, still 15 mA or less
A trip affects only that way, not the whole floor
The final protection type and rating comply with local rules, with a signed record from the electrician
Leakage figures for constant-voltage units H01, K01 and S01 and constant-current unit H19 must come from their own datasheets. Circuit current and power conversion runs through the LED driver sizing calculator, and outdoor or damp locations add the condensation and insulation requirements in IP rating and outdoor selection.
The 0.25 to 0.75 mA range here is a typical order of magnitude, not a commitment for any specific model. Selection and modification of distribution and protective devices must follow local rules and the latest requirements of the certifying body, carried out by a licensed electrician.
Send us the number of units on the circuit, the wattage per unit, the RCD type and its rated residual current. We will compute how many units the circuit can carry, say whether to split or to change the protection, and write it up for your electrician. Contact →